• BluescreenOfDeath@lemmy.world
    link
    fedilink
    English
    arrow-up
    4
    ·
    edit-2
    1 day ago

    Your infrastructure cabling shouldn’t ever be terminated to rj45. That should always be terminated to a keystone jack.

    But even if you’re dealing with cables that were terminated into rj45 and need to be relocated with rj45s at the new location, you should just go ahead and cut the ends off. The cable can get snagged and stuck with the end on.